One of major thing need to be achieved before building the construction structural would be your structural foundation. The sort of construction foundation are raft base, footing base, piling foundation. Ordinarily earlier assemble a building, we need to inspect soil state for this construction. This is accomplished by carried out land analysis (SI). The analysis of SI document can be utilized for decide form of foundation.

Being a consulting engineer, it’s going to be usually that engineer need to organize RC drawings for client. Client desire it to get figures purpose. Ordinarily, SI will carry out in the subsequent stage i.e. after the earthworks completion zemní práce Praha.

As a consequence, just how do consulting engineer to perform preliminary variety of base?

Preliminary selection of foundation may be contingent on exactly the earthworks drawings. A very simple way is referring to this cut and fill region from earthworks foundations. Where by cut
space

can select as pad base and fill area will probably select just as pile base. When fill area is less than 1.2m, but it still can serve as base foundation because foundation desire a selected thickness for build.

Yet another procedure of determination is by on site excavation, engineer must go to web page to witness that the ground affliction. Engineer can see the method by which the excavator excavate earths. Will the excavator can easy get rid of the soil. Can soil is free at vertical sides of excavation hole. If the answer is YES, then ground is tender. It can be advocated touse pile foundation else mat base might be advocated.